Start at Project Design Studio. To open a workspace, sign in with an active paid plan and access to that studio. The studio catalog and lab plan are separate: check dashboard access before starting a project.

First walkthrough: UPS design

  1. Open Data Center Power Design Studio and start a new UPS project.
  2. Define the critical load and backup target, then trace the chosen voltage from source to load.
  3. Calculate an estimate, review the one-line diagram and checks, and compare another voltage under the same assumptions.
  4. Save and reopen the project, then export a report. Check that the report reflects the selected scenario, inputs, units, and review notes.

All studio tutorials

For each design study, cover the default assumptions, an alternate scenario, how to save or export where available, and what requires independent verification. Treat screening outputs as preliminary, not as approval for installation or operation.