# Project Design Studio

> Tutorial outline for all design studies and guided learning workspaces.

Start at [Project Design Studio](https://numberelectric.com/power-design-studio). To open a workspace, sign in with an active paid plan and access to that studio. The studio catalog and lab plan are separate: check dashboard access before starting a project.

## First walkthrough: UPS design

1. Open [Data Center Power Design Studio](https://numberelectric.com/power-design-studio/ups) and start a new UPS project.
2. Define the critical load and backup target, then trace the chosen voltage from source to load.
3. Calculate an estimate, review the one-line diagram and checks, and compare another voltage under the same assumptions.
4. Save and reopen the project, then export a report. Check that the report reflects the selected scenario, inputs, units, and review notes.

## All studio tutorials

| Category | Workspace | Walkthrough and checkpoint |
| - | - | - |
| Guided learning | Power Quality and Fault Workbench | Compare normal, harmonic, and fault cases using waveforms, phasors, and sequence components. |
| Guided learning | Math-to-Power Learning Paths | Work through ratios, phase angles, and smooth transitions in short electrical examples. |
| Supply and capacity | Data Center Power Design Studio | Trace and compare UPS configurations, then save a design and export its report. |
| Supply and capacity | DC Backup & Distribution | Compare two DC buses on the same branch schedule and check load voltage and battery runtime. |
| Supply and capacity | Load Profile & Capacity Planning | Compare baseline, peak-day, and expansion scenarios. Check hourly peaks, daily energy, and spare capacity; cover CSV import. |
| Supply and capacity | Generator & Microgrid | Compare grid-connected and islanded cases for capacity, load steps, and fuel runtime. |
| Distribution design | Feeder Design | Compare conductor sizes and parallel runs for ampacity and voltage drop. |
| Distribution design | Transformer Design | Estimate kVA, winding-side currents, and regulation for a sample load. |
| Distribution design | Cable & Raceway | Compare raceway fill, adjusted ampacity, and estimated voltage drop across installation scenarios. |
| Faults and protection | Short-Circuit Study | Compare balanced and unbalanced fault cases and review equipment duty. |
| Faults and protection | Arc-Flash & Protection | Compare preliminary screening results and protective-device clearing time across scenarios. |
| Faults and protection | Grounding & Bonding | Compare ground potential rise, preliminary conductor thermal area, and touch and step voltage margins. |
| Faults and protection | Protection Device Selection | Screen breaker and fuse candidates against circuit voltage, current limits, and available fault duty. |
| Operating analysis | Power Quality | Compare harmonics, displacement power factor, voltage sags, and filtering assumptions. |
| Operating analysis | Energy & Operating Cost | Compare annual facility energy, utility charges, and estimated savings under two scenarios. |

For each design study, cover the default assumptions, an alternate scenario, how to save or export where available, and what requires independent verification. Treat screening outputs as preliminary, not as approval for installation or operation.